A buried valve is bought for thirty years of neglect. Nobody opens a valve pit for a routine check, nobody repacks a stem in a wet trench, and nobody wants a body joint sitting in groundwater. That is the argument for a fully welded body, and it is also the argument's weak point: a valve you cannot open has to be designed so that everything that wears can still be reached, bled, injected or adjusted from grade. This page covers the API 6D fully welded trunnion ball valves supplied for the pipeline new-build of PT Perusahaan Gas Negara in Cilegon, West Java β NPS 16 and NPS 20 mainline valves, NPS 2 branch valves, Class 300, ASTM A350 LF2, DIB-1 double block and bleed, Powercrete R95 coating, and every auxiliary line run up to the gearbox.
1. The duty, in six lines
Service: natural gas, distribution network new-build in Cilegon, West Java β mainline and branch isolation, part of the scope buried or installed in valve pits
Valve: API 6D fully welded trunnion-mounted ball valve, full bore, Class 300, RF flanged per ASME B16.5
Body, ball and seat: ASTM A350 LF2 low-temperature carbon steel; stem ASTM A182 F6a with 0.08 mm electroless nickel plating
Sealing: PMSS soft seat with Viton AED inserts, DIB-1 configuration with DPE on both seats, SS 316L weld overlay as the metal-to-metal backup
Operation: worm gear and handwheel on NPS 16 and NPS 20; lever on NPS 2
Testing: shell 7.5 MPa, seat 5.5 MPa, air 0.6 MPa, per API 6D and API 598
Everything else β the coating, the drain and vent piping, the injection ports, the lock β follows from these six lines and from one more question the schedule had to answer: is this valve going underground.
2. Why fully welded, and what it costs
In a split-body valve the body joint is a gasket under bolted preload. Above ground it is a maintenance item: re-torque the bolting, replace the gasket, carry on. Buried, the same joint is the one leak in the assembly that cannot be fixed without a excavator, a permit and a shutdown. Fully welded construction deletes the joint. Nothing to re-torque, no gasket to age, no crevice between body halves for groundwater to sit in.
The price of that decision is stated plainly in the drawing: the body does not come apart. So the design has to make the wear parts serviceable from outside. On this valve that means four sealant injection ports, each behind double check valves β one mounted inside the body so pipeline pressure cannot push media back out through the injection fitting β plus drain and vent connections with double block sealing valves and metal caps. On the buried valves, all of that piping is extended up to the gearbox so an operator standing on the ground can bleed a cavity, verify a seat or inject sealant without opening the pit.
Welding a body at NPS 20 is the other half of the cost. The circumferential seam has to be full-penetration, and it has to leave the body round: ball-to-seat concentricity, seat contact area and stem alignment all have to survive the heat. The procedure is controlled preheat, layered deposition, and dimensional verification after welding β before any pressure test, because a body that has moved will pass a shell test and still not seal.
3. Where these valves sit in a gas network
The package belongs to PGN's distribution network expansion around Cilegon: new pipeline connections and associated facilities, with the valves doing section isolation on the mainline and take-off isolation on the branches. The NPS 16 and NPS 20 valves are the ones a maintenance crew will plan around for the next few decades; the NPS 2 valves are the ones at every branch, where a lever and a padlock are the whole operating philosophy.
Class 300 in a distribution network is a specification decision rather than a process requirement. The ambient rating is 720 psig, about 49.6 bar, well above the pressures these lines normally see. What it buys is margin on transients and a single pressure class across the operator's standard, which matters more to a utility than the metal it costs.
The service is also the reason a soft seat is defensible here at all. Sales gas is dry and clean: no solids to erode the insert, no condensate to swell it, no wet chloride to pit the ball. For a pipeline valve running tens of cycles a year, a Viton AED insert will outlast the coating around it. The accident case is not corrosion β it is fire, and that is what the 316L overlay and the graphite secondary seal are for.
4. What the valve schedule fixed
Four decisions were locked before the first body was welded:
One design language across three sizes - NPS 16, NPS 20 and NPS 2 share body material, stem, seat insert, seat configuration and test pressures. Only the operator changes. For a utility that means one spare parts list, one training session and one maintenance procedure instead of three.
DIB-1 with DPE on both seats - each seat seals independently from either direction, so the valve isolates regardless of which side the pressure arrives from, and the cavity between the seats can be bled to prove it. That is the whole reason the drain and vent connections are specified on a valve whose job is isolation.
Class 300, A350 LF2, minus 29 degrees - the body, ball and seat are the same low-temperature carbon steel, impact-tested at the bottom of the design range. In a tropical climate the low-temperature requirement is margin, not duty β but it is the operator's standard, and it is what the material certificate has to prove.
Installation decided the accessories, not the size - buried valves get Powercrete R95 coating per PGN's painting specification and all auxiliary piping extended to grade. The NPS 2 branch valve, accessible above ground or in a shallow pit, carries neither. Same valve internals, different envelope.
5. Configuration matrix
| Item | NPS 16 and NPS 20 | NPS 2 |
|---|---|---|
| Type | API 6D fully welded trunnion ball valve, full bore | API 6D fully welded trunnion ball valve, full bore |
| Pressure class | Class 300 (720 psig / 49.6 bar ambient) | Class 300 (720 psig / 49.6 bar ambient) |
| Body / ball | ASTM A350 LF2 | ASTM A350 LF2 |
| Seat body | ASTM A350 LF2 | ASTM A350 LF2 |
| Stem | ASTM A182 F6a, 0.08 mm ENP | ASTM A182 F6a, 0.08 mm ENP |
| Seat insert | Viton AED (PMSS soft seat) | Viton AED (PMSS soft seat) |
| Seat sealing face | SS 316L weld overlay, metal-to-metal backup | SS 316L weld overlay, metal-to-metal backup |
| Seat configuration | DIB-1, DPE x DPE, bi-directional | DIB-1, DPE x DPE, bi-directional |
| End connection | RF flange per ASME B16.5 | RF flange per ASME B16.5 |
| Operation | Worm gear, handwheel, lockable | Lever, max 500 mm, max 360 N operating force |
| Position indicator | Mechanical, open / partial / closed | Mechanical, open / partial / closed |
| Sealant injection | 4 ports, double check valves (one inside the body) | Not required |
| Drain / vent | Double block sealing valves, metal caps, piped to grade | Not required |
| Design temperature | Minus 29 to 120 Β°C | Minus 29 to 120 Β°C |
| External coating | Powercrete R95 per PGN painting specification | Powercrete R95 per PGN painting specification |
| Fire safety | Fire-safe design per API 607 / API 6FA; graphite secondary seal | Fire-safe design per API 607 / API 6FA; graphite secondary seal |
| Anti-static | SS 316 spring, ball-stem-body continuity | SS 316 spring, ball-stem-body continuity |
| Test pressures | Shell 7.5 MPa, seat 5.5 MPa, air 0.6 MPa | Shell 7.5 MPa, seat 5.5 MPa, air 0.6 MPa |
6. Materials and sealing: what the gas touches
A350 LF2 body, ball and seat. Low-temperature carbon steel, normalized and impact tested at minus 29 degrees. It is the default material for pipeline valves for a reason: dry sales gas is not a corrosion environment, so the governing requirements are toughness, weldability and cost β and austenitic stainless buys nothing here except a welding problem between dissimilar materials.
A182 F6a stem with 0.08 mm ENP. A 13 % chromium martensitic stainless: hard enough to resist wear at the packing, corrosion resistant enough for the gland, and strong enough that the stem diameter stays small. The electroless nickel layer is specified at 0.08 mm rather than left as βplatedβ because thickness control is what keeps gland friction β and therefore operating torque β repeatable from valve to valve.
Viton AED seat inserts. AED is anti-explosive-decompression. Standard FKM absorbs gas at pressure and blisters when the pressure comes off quickly β exactly what happens on a pipeline blowdown. The AED grade is formulated for that failure mode, and in gas service it is the difference between a seat that survives a depressurisation and a seat that has to be injected back into service.
SS 316L weld overlay on the seat face. The secondary seal, and the reason the fire-safe claim is structural rather than nominal: when the insert is consumed, the ball closes onto the overlay metal to metal and the valve still isolates. An overlay, not a coating β it is deposited and machined, so it survives the fire and the debris that come with it.
Graphite packing and an anti-static spring. The packing is graphite because it is the part that has to keep sealing after everything elastomeric has failed. The SS 316 spring keeps ball, stem and body electrically continuous, so the static charge that dry gas generates at velocity goes to the pipeline instead of finding a path through the packing.
Powercrete R95 coating. A thick-film epoxy system for buried steel, applied over a properly prepared surface with particular attention to flange faces and weld bevels β the two places where coating continuity is decided and where touching up after burial is not an option.
7. Where this valve is NOT the answer
Sour service above the ISO 15156 limits. A350 LF2 with standard trim is not automatically NACE-qualified. Once the H2S partial pressure crosses the threshold, material selection, hardness limits and bolting all change, and the requirement has to be on the schedule β it cannot be retrofitted after the body is welded.
Throttling duty of any kind. A ball valve is an isolation valve. At part open the soft seat edge sits directly in the gas path and erodes; the valve that is cheap to buy this way becomes the one that will not seal after a year of regulation duty. Control duty belongs to a control valve.
An operator who expects to open the body. If the maintenance philosophy is to pull the body apart and replace seats in place, this design is the wrong answer by definition. Fully welded means top-entry or split-body is the other choice β and each of those puts a joint back into the ground.
Temperatures outside the envelope. Minus 29 to 120 degrees is the design range, and the upper end is set by the AED insert, not by the steel. Cryogenic service and hot gas both need a different seat design.
High-cycle service. Tens of cycles a year, the insert lasts decades. Daily cycling is a different wear problem, and it argues for a metal-seated valve rather than a soft-seated one.
Small-bore utility lines. An NPS 2 fully welded valve on instrument air is over-specified: a standard flanged ball valve is cheaper, serviceable, and needs none of the injection hardware.
8. Verification and document package
Testing follows API 6D with API 598 as the test method, valve by valve, and the numbers in the schedule are traceable to the rating: the shell test at 7.5 MPa is 1.5 times the 49.6 bar Class 300 rating, the seat test at 5.5 MPa is 1.1 times, and the 0.6 MPa air test is the low-pressure check that catches a seat which passes hydrostatic on surface tension alone. Both DPE seats are tested from both directions, because a DIB-1 valve that seals on one side only has not been tested at all.
Torque is measured per API 6D at break-to-open and running, and on the NPS 2 valve that measurement is the one that matters to the operator: the lever is capped at 500 mm and 360 N, so the test is what proves a person can actually seat the valve in the field. NDE is performed to ASME Section V with acceptance under MSS SP-53. Dimensional inspection of bore concentricity, seat contact and stem alignment is recorded after welding and before pressure testing.
Fire-safe compliance is stated correctly here: API 607 and API 6FA are design qualification and type tests, not a test performed on each valve. What each valve ships with is the fire-safe design β the 316L overlay, the graphite packing, the anti-static spring β plus the qualification certificate that covers the design. Material certificates are issued to BS EN 10204 Type 3.1 or 3.2 as the schedule requires; for a state-owned operator the 3.2 route, with an independent inspector signing, is usually the one written into the contract.
9. FAQ
Why fully welded rather than split body?
Because of where it sits. Buried, the body joint is the only part of the valve that cannot be reached, retightened or regasketed without excavation, and it is also the part most exposed to groundwater. Fully welded deletes it. The trade is body access, which is why the injection ports, the drain and vent, and the piping up to grade are not accessories on this valve β they are the maintenance plan.
DIB-1 or DIB-2 β which one do I need?
DIB-1 puts double piston effect on both seats: the valve seals from either direction, and the cavity between the seats can build pressure from either seat, so it has to be bled. DIB-2 makes one seat self-relieving into the cavity, so trapped pressure cannot accumulate. In dry gas with a drain to grade, DIB-1 is the honest choice and the cavity bleed is a feature rather than a chore. In liquid service, where thermal expansion of a trapped cavity is a real overpressure case, DIB-2 is often the better answer. The schedule has to say which, because they are not interchangeable after the fact.
Can a buried fully welded valve really be serviced?
Within limits, and the limits should be stated. The sealant injection system restores seat and stem seal performance in situ, without a shutdown; the drain and vent piped to grade let an operator bleed the cavity and prove which seat is passing. What cannot be done is replacing a seat. That is a cut-out, and the design assumes it never has to happen in the service life β which is why the injection system exists in the first place.
Why Viton AED instead of standard FKM?
Rapid gas decompression. Under pressure, gas dissolves into the elastomer; when the pressure is released quickly the gas expands inside the material and blisters or splits it. Standard FKM is vulnerable, AED grade is formulated against it. On a gas pipeline the depressurisation event is not hypothetical β it is a planned operation and an emergency scenario at the same time.
10. Send us these eight lines and we will quote
Size and pressure class, and whether full bore or reduced bore
Design temperature range, including the minimum
Body material, or the operator's standard material specification
Seat and seal arrangement: soft seat or metal seat, DIB-1 or DIB-2
Installation: buried, valve pit, or above ground β this decides the coating and the auxiliary piping
Operation: lever, gear or actuated, and the maximum force a person may be asked to apply
Testing standard, plus fire-safe, anti-static and NACE requirements
Certification level: EN 10204 3.1 or 3.2, and whether third-party inspection is required
Valve technical data on this page: project valve schedule and approved drawings for the PGN Cilegon pipeline package β API 6D fully welded trunnion ball valves, NPS 16 / NPS 20 / NPS 2, Class 300. Materials and test pressures as specified at order stage; confirm against the approved drawing for any repeat order.
Recommended Products for This Application
Based on the operating conditions and media described above, we recommend: