发电
适用于化石燃料、核能和可再生能源电厂的高温高压阀门。FLOWKS闸阀和截止阀已在全球发电厂得到广泛应用和验证。
Recommended Solutions
弹性楔式闸阀
One-piece wedge with a slot allowing flexibility for tight sealing in varying temperatures.
标准截止阀
Z-body globe valve for general throttling and isolation service.
锻造固定球阀
Anchored ball design with spring-loaded seats for reliable sealing in high-pressure service. Side-entry and forged body options available.
Applications in 发电
主蒸汽和再热系统
主蒸汽管道将温度为540-565℃、压力为170-250巴的过热蒸汽从锅炉输送至汽轮机。柔性楔形闸阀用于在启动和维护期间隔离锅炉各段。截止阀控制减温器喷水,以调节蒸汽温度。铬钼合金钢(WC6/WC9)可承受热循环而不发生蠕变性能退化。
给水和凝结水
锅炉给水泵通过给水控制阀向锅炉输送高压水。这些球形控制阀在运行过程中会经历严重的汽蚀和闪蒸。采用多级泄压的防汽蚀阀芯设计可以延长阀门的使用寿命。冷凝水抽取泵使用带有低压弹簧的止回阀。
冷却水和循环水
直流和循环冷却水系统采用大直径蝶阀(24-72英寸)进行流量隔离。橡胶衬里或环氧涂层阀门可抵抗微咸水或海水冷却中的腐蚀。冷凝器管束需要隔离闸门以便于清洁和维护。
烟气脱硫(FGD)
湿式脱硫装置利用石灰石浆液从锅炉烟气中去除二氧化硫。浆液阀用于处理具有磨蚀性的石灰石和石膏混合物。常用的阀门是橡胶衬里蝶阀和夹管阀。为了隔离出口,双耳蝶阀可实现与腐蚀性饱和烟气的完全密封。
Industry Standards
[ASME B16.34] 阀门 -- 压力-温度额定值
压力边界要求
[ASME B31.1] 电力管道
发电厂管道系统设计
[API 598] 阀门检验和测试
工厂验收测试
[MSS-SP-67] 蝶阀
设计和测试标准
[IEC 60534]工业控制阀
控制阀尺寸和噪声预测
Materials Available
- ●WC6 (1.25Cr-0.5Mo)
- ●WC9 (2.25Cr-1Mo)
- ●C12A (Grade 91)
- ●A105
- ●316SS
- ●Rubber-Lined Steel
- ●Epoxy-Coated Steel
Frequently Asked Questions
高温蒸汽阀门使用哪些材料?+
给水系统中控制阀的尺寸是如何确定的?+
核电站需要哪些阀门认证?+
What valve certifications are required for nuclear power plants?+
Related Articles
Technical insights and case studies related to 发电 applications.
Cavitation and Noise in Control Valves
Control valves operating at high pressure drops face two destructive forces: cavitation and fluid-dynamic noise. Both stem from the same physics — pressure falling below the fluid's vapor pressure at the vena contracta — but they manifest differently and require distinct mitigation strategies. Corre
⏱ 5 min readASME B16.34-2025 Valve Rating Changes Explained
A breakdown of the ASME B16.34-2025 revision and its impact on valve specification, procurement, and compliance. **Tags:** ASME B16.34, valve pressure-temperature ratings, valve procurement, material groups, NDE requirements
⏱ 5 min readAPI 6D, pipeline valves, DIB-1, DIB-2, valve procurement, PHMSA compliance, ball valve, gate valve, check valve
The 25th Edition of API 6D introduces revised DIB-1 and DIB-2 definitions, extended hydrostatic test durations, enhanced traceability marking, and updated actuator interface requirements. With PHMSA incorporating the edition by reference into US pipeline regulations, procurement teams must update sp
⏱ 5 min read